The equiment at the site for the TUBOGEL® process consists of:
- 2 tank wagons with exhaust provision separate for the two injection components T1 and T2. Both vehicles are equipped with pump aggregates and a weighing device for the calculation of the margin filling volume.
- Tools for prepare- and follow-up work (i.e. Schachthaken, construction site barriers etc.)
- High pressure flush vehicle
- Camera for sewer pipeline TV inspections
- Barrier elements such as barrier bubbles and discs
- Pressure hoses, suction hoses, nozzles and the like
- Analytical instruments for quality assurance of the fluids T1 andT2
- Auxiliary materials such as pumps for water consistancy