Step 3 of 11

The equiment at the site for the TUBOGEL® process consists of:

  • 2 tank wagons with exhaust provision separate for the two injection components T1 and T2. Both vehicles are equipped with pump aggregates and a weighing device for the calculation of the margin filling volume.
  • Tools for prepare- and follow-up work (i.e. Schachthaken, construction site barriers etc.)
  • High pressure flush vehicle
  • Camera for sewer pipeline TV inspections
  • Barrier elements such as barrier bubbles and discs
  • Pressure hoses, suction hoses, nozzles and the like
  • Analytical instruments for quality assurance of the fluids T1 andT2
  • Auxiliary materials such as pumps for water consistancy